All resources All webinars

Streamlining the Construction Project Closeout and Turnover Process

The project closeout and turnover process is far from simple. When it comes time to close out a project, general contractors and subcontractors need to capture all as-built data on their drawings, track down O&M documentation for installed equipment, and secure signed warranty letters. Owners must then decide the best way to store and distribute these deliverables to facilities managers who will be maintaining the life and health of the building for decades to come. Watch our on-demand webinar to learn key problem areas associated with project closeout and turnover. We provide best practices to help you streamline the process as well as prevent project delays, missing data, and damaged client relationships.

In this webinar we discuss:

  • Difficulties organizing closeout data and as-builts
  • How to minimize time lost during data collection and transfer
  • Delivery methods for closeout drawings and documents
 

Register for webinar

Thanks for registering!

Past webinars:
55:28 min
Construction Disconnected: Aligning Technology Investment with Needs in the Field
63:00
[Engineering News-Record] Work-Life Balance: Real or Really Impossible? Strategies for AEC Success
35:39 min
Increasing Productivity in a Tight Labor Market: Why Lean Construction isn't Enough